User Manual
3.
Press
to run the OCP calibration or press
to abort. The OCP
calibration is an automatic
process that will take about 20 to 30 seconds
.
4.
After the calibration is finished, the following message will be
displayed
:
5.5
External Voltage Programming
Calibration
Follow the steps below to perform the external voltage programming calibration:
1.
Connect the DMM to the external analog control terminals of DB25 connector (+ on the DMM to
Pins 9 and 11, - on the DMM to Pin 22 (GND)) on the rear of the power supply, as shown in the
figure below
:
Figure 5.4
–
External Voltage Programming Calibration Diagram
2.
Set the DMM to a DC voltage measurement. Select the
EXT VOLTAGE
parameter in the
Calibration
menu and press
.
The following will be displayed
:
The P: 1/2 signifies there are 2 points to be calibrated and the current calibration
point is 1.
1.
Input the voltage reading from the DMM in the METER
parameter by using the numeric
keypad and press
.
2.
Repeat this procedure by entering the meter readings for points
2.