User Manual

2.
Select the
OVP
parameter in the
CAL
menu and press
. The following will be displayed:
3.
Press
to run the OVP calibration or press
to abort. The OVP calibration is an automatic
process that will take about 10 to 20 seconds.
4.
After the calibration is finished, the following message will be
displayed:
5.4 OCP Calibration
The overcurrent protection (OCP) can be executed right after the
current calibration or the user can
select OCP in the Calibration menu.
Follow the steps below to perform the voltage calibration:
1.
Short the output + and - terminals of the power supply as shown below:
Figure 5.3
OCP Calibration Diagram
2.
Set the Electric Load in CV mode, the voltage set 5V.
Select the
OCP
parameter in the
CAL
menu
and press
. The following will be displayed: