User Manual

86
Figure 40 Connection Alignment
Figure 41 Do Not Connect Vertically
2.4 Preliminary Check
Complete the following steps to verify that the instrument is ready for use.
1. Verify AC Input Voltage
Verify and check to make sure proper AC voltages are available to power the instrument.
The AC voltage range must meet the acceptable specification as explained in Input
Power Requirements.
2. Connect Power
Connect AC power cord to the AC receptacle in the rear panel and press the power
switch to the | ( ) ON position to turn ON the instrument. The instrument will have
a boot screen while loading (see Figure 10), after which the main screen will be
displayed.
After power on, the loading screen will be displayed for about five seconds. The firmware
version is found on the loading screen: