Calibrate the meter:
The first time the system is operated.
Whenever new materials are used in the system,
especially if the materials have viscosities that differ
significantly.
At least once per month as part of regular mainte-
nance.
Whenever a flow meter is serviced or replaced.
1. Press Standby on the Operator Station.
2. Shut off all spray or dispense devices connected to
the ProMix™ II.
5. On the EasyKey™ Display, press Setup key to
access setup screens.
WARNING
To avoid splashing fluid in the eyes, wear eye protec-
tion.
CAUTION
The fluid shutoff valves and ratio check valves are
retained by mechanical stops that prevent accidental
removal of the valve stem while the manifold is pres-
surized. If you cannot turn the valve stems manually,
relieve the system pressure, then disassemble and
clean the valve to remove the resistance.
K-Factors on the Calibrate Screen are updated
automatically after the calibration procedure is
completed.
K-Factor values on the screen are viewable
only. If needed, you can manually edit the
K-Factors in Advanced Screen 2 (see page 37).
All values on this screen are in cc, independent
of the units set in Advanced Screen 1.
3. Close both fluid shutoff valves (1A, 1B) and sam-
pling valves (2A, 2B).
4. Place the beakers (minimum size - 250 cc) in
holders (C). Put the sampling tubes into the bea-
kers.
If tubes need replacing, use 5/32 in. or 4 mm OD
tubing.
6. Press key to select the Calibrate screen. Press
key and select Start from the drop-down list.
Press
to activate Dispense Valves A and B.