Technical data
Meter Calibration ◆
310633C 49
Meter Calibration
Calibrate the meter:
• The first time the system is operated.
• Whenever new materials are used in the system,
especially if the materials have viscosities that differ
significantly.
• At least once per month as part of regular mainte-
nance.
• Whenever a flow meter is serviced or replaced.
1. Press Standby on the Operator Station.
2. Shut off all spray or dispense devices connected to
the ProMix™ II.
5. On the EasyKey™ Display, press Setup key to
access setup screens.
WARNING
To avoid splashing fluid in the eyes, wear eye protec-
tion.
CAUTION
The fluid shutoff valves and ratio check valves are
retained by mechanical stops that prevent accidental
removal of the valve stem while the manifold is pres-
surized. If you cannot turn the valve stems manually,
relieve the system pressure, then disassemble and
clean the valve to remove the resistance.
• K-Factors on the Calibrate Screen are updated
automatically after the calibration procedure is
completed.
• K-Factor values on the screen are viewable
only. If needed, you can manually edit the
K-Factors in Advanced Screen 2 (see page 37).
• All values on this screen are in cc, independent
of the units set in Advanced Screen 1.
3. Close both fluid shutoff valves (1A, 1B) and sam-
pling valves (2A, 2B).
4. Place the beakers (minimum size - 250 cc) in
holders (C). Put the sampling tubes into the bea-
kers.
If tubes need replacing, use 5/32 in. or 4 mm OD
tubing.
6. Press key to select the Calibrate screen. Press
key and select Start from the drop-down list.
Press
to activate Dispense Valves A and B.
1B
1A
2B
2A
C