Technical data

Installation Mounting
16 310633C
Mounting
1. Follow Location Requirements, page 15.
2. Ensure that the wall and mounting hardware are
strong enough to support the weight of the equip-
ment (see Technical Data, page 56), fluid, hoses,
and stress caused during operation.
3. Using the equipment as a template, mark the
mounting holes on the wall at a convenient height
for the operator and so equipment is easily accessi-
ble for maintenance. F
IG. 7.
4. Drill mounting holes in the wall. Install anchors as
needed.
5. Bolt equipment securely.
F
IG. 7
EasyKey™ Display
Smart Fluid Panel
Di
mens
i
ons
Operator Station
12 in.
(304.8 mm)
12.75 in.
(323.9 mm)
13.47 in.
(342.1 mm)
14 in.
(355.6 mm)
.3 in.
(7.6 mm)
Depth: 6.38 in.
(161.9 mm)
26.5 in.
(673.1 mm)
12 in.
(304.8 mm)
16.5 in.
(419.1 mm)
.5 in.
(12.7 mm)
23.25 in.
(590.6 mm)
Depth: 11.5 in.
(292.1 mm)
with G3000/
G3000H meters
6.75 in
(171.5 mm)
5 in.
(127 mm)
7 in.
(177.8 mm)
7.5 in
(190.5 mm)
.343 in.
(8.7 mm)