User's Manual
AZALEA MSR4000 INSTALLATION GUIDE
COPYRIGHT 2008 AZALEA NETWORKS
13
¾
Site investgation: the availabity of power, installation of antenna and MSR4000.
3.5 Tools
D Safety tape, safety cap
D Insulation tool
D Installation Tool
D Measurement Tool
D Power Panel
D Template of Installation
3.6 Security Check Before Start
D Check mast installation, the material of pole and its installation should comply related
installation specification(Pole should be vertical, and grounding should be done, the
diameter is around 40-60mm;
D Grounding is prepared already;
D Check the distance between MSR4000 and Grounding point;
D If cabling need to go through wall or ceiling;
D Special installation material or tools are needed or not.
3.7 Equipment Check
D Check the integration of equipment list in the package;
D Check the integration of antenna, feeders and installation packages;
D Check the preparation of Adhesive Tape, PVC tape and strap to be enough for
installation;