3.6 Security Check Before Start
D Check mast installation, the material of pole and its installation should comply related installation
specification(Pole should be vertical, and grounding should be done, the diameter is around 40-
60mm;
D Grounding is prepared already;
D Check the distance between MSR2000 and Grounding point;
D If cabling need to go through wall or ceiling;
D Special installation material or tools are needed or not.
3.7 Equipment Check
D Check the integration of equipment list in the package;
D Check the integration of antenna, feeders and installation packages;
D Check the preparation of Adhesive Tape, PVC tape and strap to be enough for installation;