Installation Manual
Table Of Contents
- 1 Preface
- 2 AB-MAX Product Overview
- 3 Pre-Installation
- 4 Installing the Mounting Poles
- 5 Radio Installation
- 6 Installing the Interconnect Cables
- 7 Grounding the System
- 8 Installing the NIA/Power Adapter Hookup
- 9.0 Configuring the ABMAX Access Point Base Station
- Appendix A: Glossary of Terms and Abbreviations
ABMAX ACCESS POINT INSTALLATION AND MAINTENANCE GUIDE VERSION 1.1
27
OF 39
3) Using a shielded RJ-45 plug, terminate (attach plug) to the outdoor CPE Cat-5 cable per the
manufacturer's recommended specifications for plug attachment. (Recommended
manufacturer: AMP P/N 5-569552).
4) Insert the RJ-45 plug from the outdoor CPE into the RJ-45 receptacle inside the NIA
(Figure 8-3).
Figure 8-3 Connect the CPE (outdoor unit)
5) Lay the CAT-5 cable so it passes through the opening into the case between the NIA and the
cover. Replace and tighten the screw (Figure 8-4) to secure the access cover to the NIA.
Figure 8-4 Reassemble the NIA