Installation Manual Part 1
Company Proprietary
Adaptive Broadband
U-NII Product Installation Manual 05/29/2001
4-6
Figure 4-4 Access Panel Power Connection Wires
11. Using wire strippers, strip approximately 1/2" off the other end of all three leads.
12. Connect the red lead to the +48V on power supply.
13. Connect the black lead to the -48V on power supply.
14. Connect the green lead to ground on power supply.
4.4.2 Powering On The Equipment
Power on the equipment as follows:
1. Power on the anchor switch. (It will go through its startup procedure, which can take up to
three minutes.)
2. Power on the monitor.
3. Power on the Control Server.
4. When the server has finished its startup procedure, you will see a login prompt.
5. Enter the user login (
root
) and the system password (
letmein
) and press Enter. (Note text is
all lower-case.)
6. Turn ON the power supply.
7. If any of the six-transceiver power switches are OFF, turn them ON.
8. For each live transceiver, check that the yellow LED on the junction box is ON.
+ 48V
- 48 V
GROUND