Installation Manual Part 1
Company Proprietary
Adaptive Broadband
U-NII Product Installation Manual 05/29/2001
4-1
4 Server and Switch Installation
4.1 Before You Start
This part of the manual is aimed at experienced network installers. It explains how to install and
configure a Control Server(CS) and Anchor Switch (AS), and how to get an AB-Access Base
Station up-and-running.
It does not tell you how to manage an AB-Access network. This section lists the information
you will need to know before you can install a Base Station.
4.1.1 Information Required
Before you perform the installation, you will need to know which outdoor transceivers are
connected to which port on the indoor junction box (the Access Point (AP) installer should have
made a note of this).
4.1.2 Extra Equipment Required
Before you perform the installation, you will need the following equipment shown in Table 4-1:
Table 4-1 Required Tools and Equipment
Tools Required Extra Equipment Required
Crimping tool (must be specifically matched
for the RJ-45 connector used)
RJ-45 connectors
Wire stripper Roll of CAT-5 cable
Small wire cutters Monitor and cables
4.1.3 Optional Equipment
In case of power outages, an Uninterruptible Power Supply (UPS) is optional equipment that is
available and highly recommended for purchase, but it is not covered in this guide.
4.2 Unpacking The Equipment
Carefully unpack the equipment and check the items against the following lists. You should
have the following items (you may also have purchased a monitor, but as this is optional and it is
not included below).
SECTION 4
Server and Switch Installation