User manual

256
To select the files:
LeftMouseButton click to select the first file you want.
Then, either:
CtrlLeftMouseButton click to select the next file you want to select, and then CtrlLeftMouseButton
click to select the third file, and so forth.
Shift-LeftMouseButton click to select all the files between the first file you selected and the second file
you shift clicked on.
Shift-LeftArrowKey key press - to select another column of files.
Shift-EndKey key press - to select all the files between the first file you selected and the last file in the
dialog box.
The speed at which the analysis of the chosen ADsweep files occurs is the interval between sweep
reanalysis set by the
Reanalysis Period
field in the Reanalysis Protocol tabsheet (Fig. 15.4.2).
Once reanalysis has begun, it can be temporarily halted anytime by pressing the SPACE bar or clicking
on the ‘Interrupt/Next’ button.. The detection values can be changed and that will change the calculation
of the slope in the current ADsweep file. The ADsweep graph values can also be changed, and different
Windows can be chosen.
Pressing the SPACE bar or clicking on the ‘Interrupt/Next button again will move to the next ADsweep
so this will allow single stepping through all the ADsweeps and customizing each slope detection if need
be. (However, it is less biased to have one detection setting for reanalyzing the whole experiment.)
Pressing F3 or clicking on the ‘Continue button will resume or continue the reanalysis at the normal
Sweep Repeat Period.
Pressing F4 or clicking on the ‘Stop’ button will stop the Reanalysis.
Remember that during a reanalysis run, changing the detection parameters will change the
amplitude/slope of last analyzed ADsweep, and will change that value in the Amp/Slope (*.AMP) file.
Therefore if you are changing detection parameters ‘between’ reanalysis runs, do so on the first
sweep of the next reanalysis run and not on the last ADsweep of the previous reanalysis run (e.g.
supposedly ‘between’ reanalysis runs). Alternatively you can clear the calculation graphs before
proceeding.