Specifications

Assembly
13
Fig 14
UJK Router Table Top Assembly
Fig 13
Fig 15-16
Continues Over...
There are three router table tops that can be
mounted to the stand the Cast Iron, Phenolic and
MDF. The follow instructions show the Phenolic
top but it will apply for the other two table tops.
Step 1 Unpack the table, and it fixings. Lift the table
(B) on top of the stand assembly, see fig 14. Locate
them into the two threaded hole in the centre panel
(F), (See fig 13). The Phillips screws are for hanging
tools for storage. Note: Adjust the screw depth and
clamp in postion using the nut for larger tools.
Phillips screws
B
the ten Hex screws, flat washers and spring washer
and place a spring and flat washer over the Hex
threads. Lineup the threaded holes in the table with
the holes in the stand and secure in place with the
Hex screws, (See figs 15-16)
Step 2 Locate the ten countersink Phillips screws and
M6 locking nuts, place a nut onto each of the Phillips
screws and screw the countersink screws into the ten
threaded holes beneath the table insert recess. (See
figs 17-18)
Fig 17-18
Countersink Phillips screws
WARNING! THE CAST IRON TOP
IS VERY HEAVY SEEK HELP!