User`s manual
Chapter 3 Operation AX2200/AX2300 Instruction Manual
3-2 CM2-AX2000-2001 (Rev. 4, 4/2014)
Start-Up
To begin flow meter operation:
1. Verify the flow meter is installed and wired as described in Chapter 2.
2. Apply power to the meter. At start up, the unit runs a series of self-
tests that check the RAM, ROM, EPROM and all flow sensing com-
ponents. After completing the self-test sequence, the Run Mode
screens appear
.
3. The Run Mode displays flow information as determined by system
settings. Some screens depicted on the next page may not be dis-
played based on these settings. Press the arrow keys to view
the Run Mode screens.
4. Press the ENTER key from any Run Mode screen to access the Setup
Menus. Use the Setup Menus to configure the meter’s multi-
parameter features to fit your application.
Note
Starting the flow meter
or pressing EXIT will
always display the
Run Mode screens.










