Specifications
ADT Model 7100 Semi-Automatic Dicing System Maintenance Manual
Monthly Maintenance Procedures (page 1 of 2)
P/N 97100-9005-000-14 Ver 06/05
3.2-1
3.2 Monthly Maintenance Procedures
(page 1 of 2)
The maintenance procedures in this list should be performed on a monthly
basis after performing the daily maintenance procedures. The list includes
the procedures to be performed, the specifications that must be met, and a
column for indicating whether the System has passed each procedure.
Photocopy this list and mark each completed procedure.
Maintenance Technician Name: ________________________
Date: ________________________
Monthly Maintenance Procedures
(page 2 of 2)
Maintenance Technician Name: ________________________
Caution: All System operations must be stopped and any Workpieces
removed, before performing these procedures.
Monthly Maintenance Procedures
Examine Procedure & Specifications Passed
Perform Daily
Maintenance
Procedures
See section 3.1.
Clean the X Axis
Power down the System (without
turning off Air), detach the X Bellows
from the X Carriage, and clean the
surface of the X Axis with a lint-free
cloth and methanol.
Grease the X, Y & Z
Axes
See section 3.4.
Extent of Wheel Mount
Front Surface Runout
Wheel Mount Front Surface Runout
should not be greater than 2.5 microns.
(See Chapter 5 for details.)
Up and down
movements of the
MHS (for Systems
equipped with the Auto
Loader option only)
Operate the up/down movement of the
Pick-Up Arms on the MHS from the
Setup & Diagnostics Workbook.
Switch to Unprotected Mode and use
the software to manually raise and
lower the Pick-Up Arms.
Verify that each Arm moves up and
down smoothly.