Installation guide

Chuck Change
Advanced Dicing Technologies Ltd.
7.5-2
4 Follow the Wizard instructions. Click Next to install a new chuck or
Finish to leave the current chuck.
5 Update the Auto-Focus on dicer chuck, as described in section 7.5.2
below.
To replace a Thin chuck with a Thick one
1 Measure the thickness of the New and Old Chucks.
2 Access Z-Axis parameters: Workbook Workspace > Saw > Dicer >
Axes > Z.
3 Check and increase the following Z-Axis parameters according to the
measured difference of Chuck thickness:
Pre Non Contact Height Position
Calibration Start Position
4 Browse to Chuck screen (Workbook Workspace > Saw > Dicer >
Chuck) and click Chuck Change icon
5 Replace the chuck and lift the NCH or Button device. Use the NCH/
Button Adjustment Bar to level the height device with the chuck top
surface.
6 Follow the Wizard instructions. Click Next to install a new chuck or
Finish to leave the current chuck.
7 Update the Auto-Focus on dicer chuck, as described in section 7.5.2
below.
Note: After chuck replacement, set the Calibration Start Position according to
the largest blade and the highest chuck.
Note: It is recommended to perform the Chuck to Non-chuck Height procedure
using a dressed blade.
Note: When physically replacing the chuck, ensure that the Theta table is
clean.
Note: For Vectus and Fortis series, lift the NCH or Button by lifting the whole
assembly (Open screw on the X-table bracket). For older series, lift NCH or
Button device. Make sure, that the device is not taken out from the internal O-
ring of the device base.
Note: After chuck replacement, set the Calibration Start Position according to
the largest blade and the highest chuck.
Note: It is recommended to perform the Chuck to Non-chuck Height procedure
using a dressed blade.