User`s manual

AXIS 5570e/AXIS 5670e User’s ManualSection 5: Setting Up - IBM Mainframe (zSeries)
75
Verifying the
Communication:
1. Activate the connection you created in step 2 of the above SNA
Server - AXIS 5570e/AXIS 5670e connection procedures. The
status of the connection should be “active”.
2. Make sure the corresponding LU in the host is activated.
3. Activate the TN3270 connection to the AXIS 5570e/AXIS 5670e.
The LUA should change status to SSCP.
4. Check that the printer is connected to the AXIS 5570e/AXIS
5670e.
5. Send a print job from the host.
The AXIS 5570e/AXIS 5670e is now ready for use.
Notes:
NetWare for
SAA Server
To set-up a TN3270E connection to the AXIS 5570e/AXIS 5670e you
have to set up PU and LU definitions. This is done by following the
steps below:
1. Start the NWSAA Administrator.
2. Double-click the NWSAA Node. The panel below will appear.
3. Enter the Node ID for the host.
You can check the status of the TN3270E connection by printing a test page
from the Print Server. This is done by pressing the test button once. Make
sure the TN3270E status (St:) line for your server connection is defined as
either:
•SSCP
•LU-1
•LU-3
For additional information about configuring other TN3270E servers, refer
to the Technical Notes on www.axis.com