User`s manual

SHB108 LAG1156 Full-Size SBC User’s Manual
Hardware Installation
25
Step3 Processor installation:
οƒ˜ Lift processor package from shipping media by grasping the
substrate edges. Scan the processor package gold pads for any
presence of foreign material. If necessary, the gold pads can be
wiped clean with a soft lint-free cloth and isopropyl alcohol.
οƒ˜ Scan the processor package gold pads for any presence of
foreign material. If necessary, the gold pads can be wiped clean
with a soft lint-free cloth and isopropyl alcohol.
οƒ˜ Locate connection 1 indicator on the processor which aligns with
connection 1 indicator chamfer on the socket, and notice
processor keying features that line up with posts along socket
walls.