Operating instructions
TM 11-5865-229-12
SECTION Ill
AVIATION UNIT PREVENTIVE MAINTENANCE
CHECKS AND SERVICES
SECTION CONTENTS
PAGE
GENERAL
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3-3
PMCS PROCEDURES
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3-3
3-6 GENERAL.
If your equipment fails to operate, remove the faulty LRU (CCU, RT, or Antenna) and request depot main-
tenance. Troubleshoot with proper equipment. Report any deficiencies using the proper forms. See DA Pam
738–750. Routine cleaning, dusting, checking for frayed cables and/or loose hardware, storing of items not in
use, and covering of unused receptacles are not scheduled and should be done whenever necessary.
3-7 PMCS PROCEDURES.
Perform the Lamp, Operator-Initiated BIT, and Signal tests (paragraph 3-9, tests 1, 2, and 3) prior to flying
any mission requiring the use of the CM Set. These tests will ensure that the CM Set is working properly.
There are no other PMCS procedures for the CM Set.
3-3/3-4 (blank)










