User's Manual
Table Of Contents
- 1 INTRODUCTION
- 2 BOOSTER PRE-INSTALLATION REQUIREMENTS AND GUIDELINES
- 3 BOOSTER MOUNTING AND INSTALLATION
- 3.1 Booster Installation Overview
- 3.2 Unpacking and Package Contents
- 3.3 Mounting the System
- 3.4 Connections
- 4 SETUP AND COMMISSIONING
- 5 ADMINISTRATIVE OPERATIONS
- 6 MONITORING AND TROUBLESHOOTING
SMR 700 800 HIGH POWER PS NFPA CLASS A SIGNAL BOOSTER
PRODUCT DESCRIPTION AND USER’S MANUAL
Cobham Wireless – Coverage
Date: 22-Dec-16
www.cobham.com/wireless
Doc. No.00068CDUM Rev. 2.3 Page | 17
3.3.2.3 Wall Marking and Drilling – Procedure
To mark and drill the wall
1. Mark out the fixing centers of the unit on the chosen wall. Refer to the dimensions are shown below.
Figure 3-6: Fixing Centers
2. Mark and drill the wall with the correct size masonry bit as specified by the fixing manufacturer.
NOTE: It is good practice to wear goggles to protect your eyes from flying debris when using power
tools.
3. Hold the drill bit against the mark and begin drilling slowly so that the bit does not wander from the
position. The wall should be drilled to a depth which is sufficient to accommodate the full length of the
fixing.
4. Insert the fixings so that the top of the sleeve/anchor section is level with the wall surface.
5. Gently tighten the bolt by hand so that the anchor section of the fixing expands and grips the inside of
the hole.
Figure 3-7: Inserting Fixing and Tightening.