User's Manual
Table Of Contents
- 1 Introduction
- 2 Antenna and Repeater Installation Requirements
- 3 Dual-Band Repeater Installation
- 4 Two Dual Units (Quad-band) Installation
- 4.1 Overview
- 4.2 View of the Quad Band Installation
- 4.3 Required Tools and Materials
- 4.4 DIGImini Tri/Quad-band Kit
- 4.5 Upgrading to a Quad-Band System
- 5 Setup and Configuration
- 6 DMCU Installation and Management
- 1
- 6.5.2.1 Band Tabs
- 6.5.2.2 CMU Tabs
- 6.5.2.3 Operation Buttons
- 6.6 Basic Configuration Procedures
- 6.7 Communication and System Parameters
- 6.8 DMCU Administration
- 6.9 CMU Monitoring and Troubleshooting Options
- Appendix A: Specifications (@+25 C)
AXELL DIGIMINI- AMERICAS REPEATER
PRODUCT DESCRIPTION AND USER’S MANUAL
© Axell Wireless Ltd DIGImini Americas User Manual Rev 3.5 19
4 Two Dual Units (Quad-band) Installation
This procedure describes how to assemble and install the DIGImini Quad-band assembly consisting
of two repeaters. If your installation includes a DMCU, only one DMCU is required for the complete
quad-band assembly (two repeaters).
4.1 Overview
NOTE: The Donor and Mobile antennas can be positioned and installed (without being connected
to a Repeater) at any time either before or after mounting and grounding the Repeater.
1. Unpack the Repeater Tri/Quad-band kit.
2. Mount the wallmount bracket on the wall
3. Assemble the RF Combiners and Combiner Spacers onto the Quad-band brackets.
4. Using the supplied brackets, position the repeaters back to back on a flat surface and interconnect
the required interfaces as described in section
4.5.
5. Pick-up the two-Repeater assembly and hang on the mounted wall bracket.
6. Mount the Power Supplies on the wall bracket (do not connect power).
7. Perform the required isolation and link tests.
8. Connect the antennas.
9. Power-on the Repeater.
10. For installations with a DMCU is available, mount the unit (adjacent to the Repeater, on the wall,
and connect to the Repeater according to the instructions in Chapter
6.