User's Manual
Table Of Contents
- 1 INTRODUCTION
- 2 Antenna Requirements
- 3 Installing the Signal Booster
- 4 Battery Charger Description and Installation
- 4.1 Charger Ordering Information
- 4.2 Charger Architecture
- 4.3 Charger Interfaces
- 4.4 Charger Installation Procedure
- 5 Setup and Commissioning
- 6 Administrative Operations
- 7 Monitoring and Troubleshooting
- Appendix A – Booster and Charger Specifications
D-MBR 3707-3708 PS NFPA CLASS B SIGNAL BOOSTER
PRODUCT DESCRIPTION AND USER’S MANUAL
www.cobham.com/wireless Cobham Wireless – Coverage
Date: 6-Set-15
Page | 18 Doc. No. 00060CDUM Rev. 1.0
3.4.3 Mount the Unit
CAUTION!!! It is recommended that two people lift the unit since (depending on
the unit) it may weigh between 20 and 38 kg (44 and 84 lb).
To mount the unit
• Align unit with the four fixings. Great care should be exercised here as the Booster is very heavy.
(A suitably rated heavy duty scissor lift table/trolley may be suitable for this operation.)
• Once the unit is held in the chosen position, carefully insert the fixing bolts through the mounting
lugs of the unit and into the sleeve/anchor sections of the fixing in the wall and tighten the bolts.
• The unit needs to be mounted tightly to eliminate vibration.
Figure 3-10: Mount Unit
Align
unit and
secure bolts