User's Manual
Table Of Contents
- FCC Part 15
- Unauthorized Changes to Equipment
- FCC RF Exposure Limits
- Antenna Installation
- Compliance with FCC deployment rule regarding the radiation of noise
- 1 Introduction
- 2 Antenna and Repeater Installation Requirements
- 3 Installation
- 4 BSF-4004 Commissioning
- 5 BSF-4004 Full GUI Description
- 6 Monitoring, Fault Sourcing and Maintenance
- Appendix A - Specifications
- Appendix B - F/O Cleaning Procedure
AXELL BSF-4004 BSF0038 SERIES REPEATER
PRODUCT DESCRIPTION AND USER’S MANUAL
3.7.2.3 230 VAC Power Source
Connect the power cable to the plinth as show below:
• Phase linked to the brown cable
• Neutral linked to the blue
• Ground to the yellow/green. See illustration below.
Figure 3-17: 230 VAC Power Connections
3.7.2.4 115 VAC Power Source
Cable requirements:
• Cable should be NRTL (safety) approved with a minimum of 14AWG (2.5mm) per conductor.
• For safety, the GND cable must be 10mm longer than the Phase and Neutral cables.
Connect the power cable to the plinth as show below:
• Phase linked to the Black cable
• Neutral linked to the White
• Ground to the Green where for SAFETY, the GND cable must be 10mm longer than the Phase
and Neutral cables.
Figure 3-18: 115VAC Power Connections
16 Doc. No. PN 4004 BSF0038 Series-UM Rev. 1.0 © Axell Wireless Ltd