Installation Guide
Table Of Contents
- Compliance with FCC
- Compliance with IC
- General Safety Warnings Concerning Use of System
- Table of Contents
- 1 INTRODUCTION
- 2 INSTALLATION REQUIREMENTS and PROCEDURE
- 2.1 Service Antenna Requirements
- 2.2 Infrastructure and Cabling Considerations
- 2.3 Repeater Installation
- 3 GETTING STARTED
- 4 DIRECT ACCESS MENU OPTIONS
- 5 MONITORING AND FAULT SOURCING
- 6 MAINTENANCE
- APPENDIX A – SPECIFICATIONS
- APPENDIX B – F/O CLEANING PROCEDURE
MBF-40 SMR700/SMR800 PS REPEATER
PRODUCT DESCRIPTION AND USER’S MANUAL
www.cobham.com/wireless Date: 28-Jan-16 Cobham Wireless – Coverage
Page | 28
Rev. 2.1 Doc. No. 00046UM
To connect the power cables
1. Refer to the power requirements as described in section 2.2.3.
2. Open the repeater door.
3. According to the repeater model, route the
power cable through the power interface
and towards the power plinth.
Figure
2-24: Example of MBF-40 Model
4. -48VDC, connect wires to the plinth as
follows:
• Phase linked to brown cable
• Neutral linked to the blue
• Ground to the yellow/green.
Figure
2-25: -48VDC Power Connections
Route power cable
through front panel
Connect wires
to plinth