Installation Guide
Table Of Contents
- Compliance with FCC
- Compliance with IC
- General Safety Warnings Concerning Use of System
- Table of Contents
- 1 INTRODUCTION
- 2 INSTALLATION REQUIREMENTS and PROCEDURE
- 2.1 Service Antenna Requirements
- 2.2 Infrastructure and Cabling Considerations
- 2.3 Repeater Installation
- 3 GETTING STARTED
- 4 DIRECT ACCESS MENU OPTIONS
- 5 MONITORING AND FAULT SOURCING
- 6 MAINTENANCE
- APPENDIX A – SPECIFICATIONS
- APPENDIX B – F/O CLEANING PROCEDURE
MBF-40 SMR700/SMR800 PS REPEATER
PRODUCT DESCRIPTION AND USER’S MANUAL
Cobham Wireless – Coverage Date: 28-Jan-16 www.cobham.com/wireless
Doc. No. 00046UM Rev. 2.1
Page | 17
2.3.3 Wall Mount Installation
IMPORTANT!!
• The repeater mounting procedure is for concrete or brick walls only.
• The weight of the unit requires that two people mount the unit on the wall.
• The signal booster must always be installed vertically with the connectors on the
underside for protection.
Horizontal installation on a bench for long time may cause
damage to the signal booster due to over-heating.
2.3.3.1 Wall Mount Bracket Assembly
NOTE: In addition to the mounting brackets, it is recommended to use additional fixings as described in section
2.3.3.4.
To assemble the brackets
Assemble the brackets to the Repeater using the supplied 4 x M8 bolts and Spring Washers as shown
in the following figure.
Figure 2-6. Position of Brackets for Wall mount
X4 M8 bolts
X4 M8 spring washers
4 M8 bolts
X4 M8 spring washers