5.6 Commissioning
Once all connections are made the equipment is ready for commissioning.
To commission the system the test equipment detailed in Section 6.2 will be required.
Using the system diagrams and the end-to-end test specification, the equipment should be tested to
ensure correct operation. Typical RF levels that are not listed in the end-to-end specification, such as
input levels to the fibre transmitters are detailed in the maintenance section of this manual.
On initial power up the system alarm indicators on the front panels of the equipment should be
checked. A red LED illuminated indicates a fault in that particular tray that must be investigated before
proceeding with the commissioning. A green LED on each shelf illuminates, to indicate that the power
supply is connected to the shelf
In the event that any part of the system does not function correctly as expected, check all connections
to ensure that they are to the correct port, that the interconnecting cables are not faulty and that they
are tightened. The majority of commissioning difficulties arise from problems with the interconnecting
cables and connectors.