Handbook
Table Of Contents
- AMENDMENT LIST RECORD SHEET
- INTRODUCTION
- 1.SAFETY CONSIDERATIONS
- 2.OVERVIEW/SYSTEM DESCRIPTION
- 3.SPECIFICATION
- 3.150-063701 Parts Lists
- 3.1.1Base Antenna Side UHF Duplex/PA Shelf 50-063702 Parts List
- 3.1.2Downlink UHF 5 Channel Shelf 50-063703 Parts List
- 3.1.3Uplink UHF 4 Channel Shelf 50-063704 Parts List
- 3.1.4Tunnel side UHF Duplex/PA Shelf 50-063705 Parts List
- 3.1.5UHF Simplex Shelf 50-063706 Parts List
- 3.1.6Power Supply Shelf 50-063707 Parts List
- 3.2Technical Specification
- 3.3Mechanical Specification
- 3.150-063701 Parts Lists
- 4.SYSTEM DRAWINGS
- 4.1Drg. No. 50-063751, Channelised Cell Enhancer Rack Layout Drawing
- 4.2Drg. No. 50-063781, Channelised Cell Enhancer System Diagram
- 4.3Drg. No. 50-063792, Base Side Duplex Shelf Outline Drawing
- 4.3Drg. No. 50-063793, Downlink Channels Shelf Outline Drawing
- 4.4Drg. No. 50-063794, Uplink Channels Shelf Outline Drawing
- 4.5Drg. No. 50-063795, Tunnel Side Duplexer Shelf Outline Drawing
- 4.6Drg. No. 50-063796, UHF Simplex Shelf Outline Drawing
- 4.7Drg. No. 50-063797, Power Supply Shelf Outline Drawing
- 5.SUB-UNIT MODULES
- 5.1UHF Duplex Shelf 50-063702
- 5.25 Channel UHF Downlink Shelf 50-063703
- 5.3UHF Uplink 4 Channel Shelf 50-063704
- 5.4UHF Duplex/PA Shelf 50-063705
- 5.5UHF Simplex Channel Shelf 60-063706
- 5.6Power Supply Shelf 50-063707
- 6.INSTALLATION
- 7.MAINTENANCE
- APPENDIX AINITIAL EQUIPMENT SET-UP CALCULATIONS
Denver Channelised CE
User/Maintenance Handbook
Handbook Nō.-50-063708HBKM Issue No:-2
Date:-03/11/2003
Page:-
45 of 51
6. INSTALLATION
6.1 Initial Installation Record
When this equipment is initially commissioned, please use the equipment set-up record sheet
(or similar) in Appendix A. This will help both the installation personnel and AFL should
these figures be needed for future reference or diagnosis.
Installation will be a matter of securing each shelf into its appropriate place in the rack
cabinet, connecting all the cables (RF, AC, DC and alarm) to their correct ports/connectors
and system testing (at the customer’s discretion) to prove the original specification. Power
should not be applied until all connections have been double-checked and verified.
Refer to the system/layout drawing(s) in section 4.0 for cabling details.