Installation Guide

Designer Awning Assembly and Mounting
1.
Measure and mark wall for head rod clamps 6 inches in from both sides of the
window.
a)
Drill pilot or anchor holes for each head rod clamp.
b)
Fasten both head rod clamps to the wall, use a level to ensure
clamps will be level with each other and centered above window.
WINDOW
2.
Optional Pulley
a)
Install one pulley on the left head rod clamp hook. Install two pulleys
on the side you want the pull cord. (One each hook)
3.
Assemble the Head Rod bar using the internal connector.
a)
Slide the Head Rod bar into the head rod pocket (see below).
4.
Attach the Head Rod bar into the Head Rod clamps (already mounted on wall)
and tighten the wing nuts.
a) See below
5.
Assemble the Front bar using the internal connector.
a)
Slide the front bar into the front bar pocket. (located near the valance of
awning)
G
M
M
N
N
G