Specifications

EDUS39-600-F20_b
FXOQ-M 36
Installation
Step 10: FINAL PRE-STARTUP CHECKS
USE SPECIAL CARE TO CHECK THE FOLLOWING ITEMS:
Items to be checked:
If not properly done what is likely to occur:
Check
Are the indoor and outdoor electronic
expansion valves fixed firmly?
The units may drop, vibrate or make noise.
Is the gas leak test finished? Insufficient Cooling
Is the unit fully insulated? Condensate may drip
Does the power supply voltage
correspond to that shown on the name
plate?
Unit may malfunction or the components may burn out.
Are wiring & piping correct? Unit may malfunction or components may burn out.
Is the unit safely grounded? Risk of electrical shock or leakage.
Is wiring size according to
specifications?
Unit may malfunction or the components may burn out.
Are refrigerant piping length and
additional refrigerant charge noted?
The refrigerant charge in the system is not clear.