10.3 Installation Steps for BEQ__MVJLR1
Step 1: BEFORE INSTALLATION
Take the Electronic Expansion Valve unit in its packing case to the installation space. Do not remove the packing case before
installation. Remove the packing tape, open the packing case top, and pull out the unit using lifting lugs. Before installing, set the
thermistor (8) on the auxiliary pipe of the Vertical Air Handling.