Installation Instructions

13
1. Dry fit the PVC pipe prior to final assembly to ensure the lengths are correct. Orient Tee as shown.
2. Glue fittings using appropriate cement and primer as required by local codes
3. Mount the 4 ear washer gasket on the overflow behind the tub. Place silicone or plumbing putty
between gasket between bathtub and bath show elbow under side of tub.
4. Place a thin bead of silicone caulking around the strainer piece and place it in the tub outlet. Draw
the strainer against the bath shoe with the strainer retainer screw. Do not over tighten or damage
can occur.
5. Place the overflow nut through the overflow plate and draw the flex head against the tub by
tightening the nut. Do not over tighten or damage can occur.
6. Slide overflow plate onto stem extending from the flex head assembly. Tighten lever for handle in-
to groove in stem to hold handle in place.
7. Adjust stopper height with the adjustment screw and holding the screw height in place with the
stopper lock nut.