Operation Manual

Configuring a Static Leased Line
67 NT/MPRI – 4 Special NT/MPRI Settings
Example for three LQRP packets
4. Configure and test the leased line at the remote site in exactly the
same way, but with the ISDN cable disconnected.
5. Re-establish the physical connection by re-connecting the ISDN
cable at the remote site. Now the PPP connection should work. If
not, even though LQRP packets were sent on both sites (while the
ISDN cable was disconnected), contact your ISDN provider for as-
sistance.
ntmpri-e.book Seite 67 Donnerstag, 28. Februar 2002 11:26 11