Installation manual

© SRAM LLC • 2010 TRUVATIV TECHNICAL MANUAL 29
D R I V E M E C H A N I S M A N D C R A N K
ARM INSTALLATION
11
Press the large shifter paddle to pull the actuator and retract
the pawls on the collar assembly. Apply grease to the drive
side bottom bracket splines and crank bolt threads. Use an 8
mm hex to install the drive side crank arm assembly, making
sure the spindle splines engage with the bottom bracket.
Tighten the crank bolt until it stops, and torque to 48-54 N·m
(425-478 in-lb).
N O N - D R I V E S I D E C R A N K A R M
INSTALLATION
12
Apply grease to the non-drive side bottom bracket splines and
crank bolt threads. Align the non-drive side crank arm to be
180° opposite the drive side crank arm. Use an 8 mm hex to
install the non-drive side crank arm, making sure the spindle
splines engage with the bottom bracket. Tighten the crank bolt
until it stops and torque to 48-54 N·m (425-478 in-lb). Check that
the crank arm contacts non-drive side crank stop (no gap). If it
doesn’t, you will need to remove the crank arm, apply
additional grease and re-install.
INSTALL CHAIN AND ADJUST CHAIN GUIDE
13
Size and install a new SRAM chain according to the installation
instructions. Use a 2,5 mm hex to adjust the location of the
chain guide if necessary. Make sure the chain guide does not
interfere with the chain when the rear suspension is fully
compressed.
48-54 N·m (425-478 in-lb)
11
48-54 N·m (425-478 in-lb)
12
13
INSTALLATION