Product specifications

Installing the Interplay | Engine on the First Node
93
3. Do one of the following:
t Click Finish.
t Analyze and resolve any issues or failures reported.
4. Click OK if prompted for a restart the system.
The installation procedure requires the machine to restart (up to twice). For this reason it is
very important that the other node is shut down, otherwise the current node loses ownership
of the Avid Workgroup resource group. This applies to the installation on the first node only.
n
Subsequent installations should be run as described in “Updating a Clustered Installation
(Rolling Upgrade)” on page 110 or in the Interplay | Production ReadMe.
Checking the Status of the Resource Group
After installing the Interplay Engine, check the status of the resources in the Avid Workgroup
Server resource group.
To check the status of the resource group:
1. After the installation is complete, right-click My Computer and select Manage.
The Server Manager window opens.
2. In the Server Manager list, open Features and click Failover Cluster Manager.
3. Open the Avid Workgroup Server resource group.
The list of resources should look similar to those in the following illustration.