5. Do the following to bring the cluster on line:
a. In the Server Manager tree (left panel) select the cluster.
b. In the context menu or the Actions panel on the right side, select “Start Cluster Service.”
Installing the Interplay | Engine on the Second Node
To install the Interplay Engine on the second node:
1. Leave the first machine running so that it maintains ownership of the resource group and
start the second node.
c
Do not attempt to move the resource group over to the second node, or similarly, do not
shut down the first node while the second is up, before the installation is completed on the
second node.
c
Do not attempt to initiate a failover before installation is completed on the second node and
you create an Interplay database. See “Testing the Complete Installation” on page 108.
2. Perform the installation procedure for the second node as described in “Installing the
Interplay | Engine on the First Node” on page 75
. In contrast to the installation on the first
node, the installer automatically detects all settings previously entered on the first node.
The Attention dialog box opens.
3. Click OK.
4. The same installation dialog boxes will open that you saw before, except for the cluster
related settings that only need to be entered once. Enter the requested information and allow
the installation to proceed.