Setup guide

Installing Codecs On Your Video I/O Board (2-Channel Models Only)
27
5. Replace the Hold Down Bracket by sliding it back into place. Once in place, tighten the
thumbscrews.
n
Lift the LSI cable that goes along the side of the chassis, so that the Hold Down bracket sits at
the bottom of the chassis in it’s slot, then, tighten the thumbscrews.
Hold Down Bracket
LSI Cable
Hold Down Bracket slots