0040-17001-01 (Revision W) Installation Checkout Page 3-41
3.11.1.2 System Status Check
Use the following procedure to check equipment interfaces and operation of the panel mount NGT-9000.
(This check is not required for the remote mount unit).
1. Cycle power to the unit.
Initialization and self-tests begin.
2. The splash screen is displayed in less than 5 seconds. See Figure 3-23.
The company name/Logo is shown on the left side and the product name on the right.
Splash Screen System Status (Passed) and Versions
System Status (Failed) System Status (Degraded)
Figure 3-23: Examples of Start-up Screens
3. The System Status is shown on the left side in less than 20 seconds
If System Status is "System Pass", then the Versions screen is shown on the right of the display.
The version screen identifies software and database information currently loaded on the unit.
Verify that the information is correct for this installation.
If System Status is "System Fail", then the message "Self-Test Failures Occurred" is shown on
the right side of the display. The option to restart the unit or to continue start up in a degraded
mode is shown on the right side of the display. Press the Restart or Continue button to proceed.
If System Status is "System Degraded", then the message "Internal Fault Detected Service Unit
Soon" is shown on the right side of the display. Press the Continue button to proceed.
4. When normal operation begins, the left screen shows the Transponder Application screen and the
right screen shows the Traffic screen. See Figure 3-24.
Figure 3-24: Example of Normal Operation