Installation Manual

Table Of Contents
Lynx NGT-9000
Installation Manual
0040-17001-01 (Revision W) Installation Checkout Page 3-32
3.8.6 Clear Fault Log
It is recommended that the fault log be cleared after completion of installation and service.
1. Clear the fault log from the MPC (MAT) by selecting Info > Fault Log. See Figure 3-15.
2. Select Clear button.
3. Answer "Yes" to confirmation dialogs.
4. Cycle power to the unit.
5. The calibration and configuration setup is complete.
Note screen extended to show log data.
Figure 3-15: MPC (MAT)Info Fault Log
3.9 INTERFACE CHECK
Use this procedure to check input and output signals. These procedures assume the following:
Power is being supplied to the aircraft and the unit.
The MPC (MAT) is active on the MPC. Refer to the General Information section, paragraph 1.9 for
details on the correct MPC (MAT) that must be used for specific software revisions (Release's).
The MPC is connected to the unit via the USB interface
After configuration options and calibration procedures where completed, power has been cycled to
the unit.
The MPC and unit are communicating and the MPC (MAT) has been restarted the unit in
Maintenance (no WiFi).