User's Manual
Table Of Contents
- Eclipse ODU 600 5.8 GHz ISM Band Installation Manual Rev.001
- Copyright & Terms of Use
- Aviat Networks Support
- Eclipse Product Compliance Notes
- Contents
- Volume I: Introduction and Safety
- Volume II: System Overview
- Volume III: Installation
- Chapter 1. Introduction to Installation
- Chapter 2. ODU Installation
- Chapter 3. INU and INUe Installation
- INU/INUe Overview
- Installation Requirements
- Installation Procedure
- Plug-in Installation
- INU/INUe Cable Assemblies
- DAC Trib Connectors and Cables
- NMS Connectors and Cables
- NMS 10/100Base-T Connector
- Maintenance V.24 Connector
- Auxiliary and Alarm Connectors and Cables
- AUX Data Cable: Async, HD26 to Wirewrap, 2 m
- AUX Data Cable: Sync, HD26 to Wirewrap, 2 m
- AUX Data Cable: Async, HD26 to 3 X DB9, 1 m
- AUX Data Cable: Sync, HD26 to 3 X DB9, 1 m
- AUX Data Cable: Async, AUX HD26 to AUX HD26, 1 m
- AUX Data Cable: Sync, AUX HD26 to AUX HD26, 1 m
- AUX Alarm I/O Cable: HD15 to Wirewrap, 2 m or 5 m
VOLUME III, CHAPTER 2, ODU INSTALLATION
Figure 2-10. Universal Lightning Arrestor Kit
The ULA has replaced the square style BGXZ and MHT
arr estors. Should installati on data be required for these
earlier ar restors, refer to User Manual Rev.025, or earlier.
Arrestor Installation at Building Entry
This section describes installation of an arrestor at the building-entry end of the
ODU cable.
The building entry arr estor must be grounded to the master
gr ound bar at, or just below, the cable point of entry. For
details on master ground bar location, refer to the Best
Practices Guide.
The ULA is intended for bulkhead-mounted on the wall-feed-through plate, or within
the cable tray just inside the building.
Refer to:
l Bulkhead Installation Procedure: Grounded Copper Entryway Plate on page
64
l Bulkhead Installation Procedure: Non-grounded / Non-master Entryway Plate
on page 66
l Building Entry Installation on page 67
l Arrestor Installation at the ODU on page 68
Bulkhead Installation Procedure: Grounded Copper
Entryway Plate
The ULA ground wire is not required if the ULA is directly mounted to a properly
grounded copper entryway plate. This plate can either be a feed-through plate form-
ing the entryway itself, or a ground termination strip just inside the shelter entry-
way. The figure below illustrates the grounded entryway option.
64 AVIAT NETWORKS