User's Manual
Table Of Contents
- Eclipse ODU 600 5.8 GHz ISM Band Installation Manual Rev.001
- Copyright & Terms of Use
- Aviat Networks Support
- Eclipse Product Compliance Notes
- Contents
- Volume I: Introduction and Safety
- Volume II: System Overview
- Volume III: Installation
- Chapter 1. Introduction to Installation
- Chapter 2. ODU Installation
- Chapter 3. INU and INUe Installation
- INU/INUe Overview
- Installation Requirements
- Installation Procedure
- Plug-in Installation
- INU/INUe Cable Assemblies
- DAC Trib Connectors and Cables
- NMS Connectors and Cables
- NMS 10/100Base-T Connector
- Maintenance V.24 Connector
- Auxiliary and Alarm Connectors and Cables
- AUX Data Cable: Async, HD26 to Wirewrap, 2 m
- AUX Data Cable: Sync, HD26 to Wirewrap, 2 m
- AUX Data Cable: Async, HD26 to 3 X DB9, 1 m
- AUX Data Cable: Sync, HD26 to 3 X DB9, 1 m
- AUX Data Cable: Async, AUX HD26 to AUX HD26, 1 m
- AUX Data Cable: Sync, AUX HD26 to AUX HD26, 1 m
- AUX Alarm I/O Cable: HD15 to Wirewrap, 2 m or 5 m
ECLIPSE INSTALLATION MANUAL
Figure 3-9. DAC 16xV2 Trib BNC Y-Cable
Figure 3-10. DAC 16xV2 Trib BNC Y-Cable Connections
Arrow towards BNC indicates data out (DAC Tx).
Arrow away from BNC indicates data in (DAC Rx).
The 1/9 in the label indicates that it is for trib 1 if the cable assembly is used
with the trib 1-8 connector, or trib 9 if used with the trib 9-16 connector.
This also applies for 2/10, 3/11, etc. up to 8/16.
260-668066-004 AUGUST 2013 91