User's Manual

Table Of Contents
ECLIPSE INSTALLATION MANUAL
260-668066-004 AUGUST 2013 X
Bulkhead Installation Procedure: Grounded Copper Entryway Plate 64
Bulkhead Installation Procedure: Non-grounded / Non-master Entryway Plate 66
Building Entry Installation 67
Arrestor Installation at the ODU 68
Weatherproofing 69
Mastic Tape 69
Wrapping Guidelines, Mastic (Butyl) Tape 69
Self Amalgamating Tape 70
Wrapping Guidelines, Amalgamating Tape 70
Chapter 3. INU and INUe Installation 71
INU/INUe Overview 72
Front Panel Layout 72
Power Supply 72
Power Consumption and INU Load Maximums 73
PCC +24 Vdc Operation 75
Power Cables 76
Fuses 77
Installation Requirements 78
Installation Procedure 80
Plug-in Installation 83
INU/INUe Cable Assemblies 86
DAC Trib Connectors and Cables 86
DAC 16xV2 Cable and Connector Data 86
DAC 4x Cable and Connector Data 92
DAC GE3 Ethernet RJ-45 Cables 94
DAC Optical Cable and Connector Data 95
DAC 155eM Cables 97
NMS Connectors and Cables 97
NMS 10/100Base-T Connector 97
Maintenance V.24 Connector 98
Auxiliary and Alarm Connectors and Cables 99
AUX Data Cable: Async, HD26 to Wirewrap, 2m 99
AUX Data Cable: Sync, HD26 to Wirewrap, 2m 100
AUX Data Cable: Async, HD26 to 3 X DB9, 1m 101
AUX Data Cable: Sync, HD26 to 3 X DB9, 1m 102
AUX Data Cable: Async, AUX HD26 to AUX HD26, 1m 103
AUX Data Cable: Sync, AUX HD26 to AUX HD26, 1m 104
AUX Alarm I/O Cable: HD15 to Wirewrap, 2m or 5m 105