User's Manual
862-01545 µLink System Manual
Issue 1 Page 23
Customer
Furnished Tools
and Equipment
The following table lists all tools and equipment
required to install the µLink System. Note that these
items must be supplied by the customer
Description Qty Remarks
13 mm Spanner 1 Used to secure the Antenna
to the Pole.
8 mm Spanner 1 Used to secure the Antenna
Mounting Bracket to the
Antenna.
Large Flat
Screwdriver
1 As above.
Earth Cable or
Strap with
5 mm earth lug
1 For earthing the IU. Braided
tube, copper tinned. Gauge 4
mm CSA. 8 x 1 mm thick,
45 A, 24/12/0,16.
Cable Ties A/R Used to secure the cable to
the mast at regular intervals.
AC Supply
Cable
OR
DC Supply
Cable
1
OR
1
Standard 3-pin IEC AC plug.
For AC supply connection to
the rear panel of the IU.
Minimum 2.5 mm square
conductor, rated for 10 A.
For connection between the
power supply and the IU DC
connector on the rear panel.
Binoculars
(optional)
1 Used for locating the far end
site. This will assist in the
antenna alignment operation.