User's Manual
Table Of Contents
- Eclipse Installation Manual for 5.8 GHz Unlicensed Band Rev.003
- Copyright & Terms of Use
- Aviat Networks Support
- Eclipse Product Compliance Notes
- Contents
- Volume I: Introduction and Safety
- Volume II: System Overview
- Volume III: Installation
- Chapter 1. Introduction to Eclipse Installation
- Chapter 2. IRU 600 Installation
- Chapter 3. INU and INUe Installation
- INU/INUe Overview
- Installation Requirements
- Installation Procedure
- Plug-in Installation
- INU/INUe Cable Assemblies
- DAC Trib Connectors and Cables
- NMS Connectors and Cables
- NMS 10/100Base-T Connector
- Maintenance V.24 Connector
- Auxiliary and Alarm Connectors and Cables
- AUX Data Cable: Async, HD26 to Wirewrap, 2 m
- AUX Data Cable: Sync, HD26 to Wirewrap, 2 m
- AUX Data Cable: Async, HD26 to 3 X DB9, 1 m
- AUX Data Cable: Sync, HD26 to 3 X DB9, 1 m
- AUX Data Cable: Async, AUX HD26 to AUX HD26, 1 m
- AUX Data Cable: Sync, AUX HD26 to AUX HD26, 1 m
- AUX Alarm I/O Cable: HD15 to Wirewrap, 2 m or 5 m
ECLIPSE INSTALLATION MANUAL
CAUTION: This product meets the global product safety requirements
for SELV (safety extra low voltage) rated equipment and the input
voltage must be guaranteed to remain within the SELV limits (60V
maximum) in the event of a single internal fault.
Always check the integrity of the dc power supply to an INU/INUe
right to its source. Never assume that the supply provided to the pick-
up point in a rack is correct.
Eclipse dc power, IF, tributary, auxiliary and NMS cables are not to be
routed with any AC mains power lines. They are also to be kept away
from any AC power lines which cross them.
12. Carry out a complete check of the installation. If all is correct, and the IRU
600 installation has likewise been completed and checked, the INU and IRU
600 are ready for power-on.
o
If a PCC is installed, ensure the PCC to NCC/NPC cable is correctly fitted
before power-on.
CAUTION: Once powered up the RFU(s) will be transmitting with the
pre-configured or ex-factory frequency and power settings unless the
start-up transmit mute option has been invoked. (All RFUs shipped
ex-factory have the transmit-mute set as the default unless other-
wise specified).If frequency and power settings are not correct, inter-
ference can be caused to other links in the same geographical area.
13. Turn power on. For -48 Vdc connect the power cable to the NCC, and to the
NPC where fitted. For +24 Vdc operation, connect to the PCC input.
o
Where a power line filter is installed (for -48 Vdc), connect to the filter
input.
CAUTION: Do not turn off an INU/INUe within 10 minutes of initial
turn-on, or initial turn-on after a new compact flash card is installed.
CAUTION: 2W2 DC power connectors can be shorted inadvertently if
applied at an angle. Always insert with correct alignment.
CAUTION: Ambient temperatures must not exceed 55
0
C (131
0
F). If
installed in a rack cabinet, it is the ambient within the cabinet.
Next Step: The Eclipse INU with IRU 600 is ready for configuration and antenna
alignment.
260-668066-001 OCTOBER 2012 73