User's Manual
Table Of Contents
- Eclipse 5.8 GHz Installation Manual
- Compliance and Notices
- Table of Contents
- Chapter 1. About Eclipse
- Chapter 2. Health and Safety
- Chapter 3. System Overview
- Chapter 4. Introduction to Eclipse Installation
- Chapter 5. Installing the IRU 600
- Chapter 6. Installing the INU and INUe
4-2 Aviat Networks
Chapter 4. Introduction to Eclipse Installation
Unpacking the Eclipse Equipment
To unpack Eclipse equipment:
1. Open the shipping boxes, carefully remove the equipment and place it on a clean,
flat working surface.
2. Ensure all the basic components and accessories for your system have been
included in the shipment by comparing the packaging, component part numbers
and product descriptions against the packing list, and cross-checking against the
installation datapack for the system to be installed.
3. If there has been shipping damage or there are discrepancies between the
equipment expected and the equipment received, contact an Aviat Networks Help
Desk or your supplier.
Eclipse Radios Basic electrician’s toolkit The kit must include a crimp lugs, a crimp tool for attaching
the lugs to stranded copper cable, and a multimeter.
Torque wrench Capable of 66 N-m or 50 ft-lb, with a selection of sockets for
antenna mount fastening
Hot-air gun For use on the heat-shrink tubing that may be supplied with
some brands of Type N connector.
Protective grease and
zinc-rich paint
For weather-protecting grounding attachment points on
towers and grounding bars.
4mm
2
(#12) green PVC
insulated strand copper
wire and grounding lugs
For grounding the indoor unit to the rack/frame
16 mm
2
(#6) green PVC
insulated strand copper
wire and grounding lugs
For grounding the rack to the station ground.
16mm is also required for chassis grounding for NEBS
compliance.
Equipment Tool/Material Description