User's Manual

MDR2400-SR, MDR5800-SR and Orion 5825-SR
Issue 10 Page 31
s. Installing the Indoor Unit (paragraph 4.2, page 32)
t. Installing the Outdoor Unit and Antenna (paragraph 4.3, page 38)
u. Installing the interconnection cables (paragraph 4.4, page 38)
4.1 Customer Furnished Tools and Equipment
The following table lists tools and equipment required to install the MDR2400-SR, the
MDR5800-SR and the Orion 5825-SR system.
General, IU-to-OU Interconnect
• Cable cutting and stripping tools.
• Ground lug crimp tools.
• 3 mm flat screwdriver - IU to OU power cable.
• RJ45 crimp tool - IU to OU data cable.
• Soldering iron.
v. Ground cable or strap rated at 45A with 5 mm ground lug for grounding the Indoor
and Outdoor Units.
w. Cable ties, used to secure the cables to the mast at regular intervals.
IU
• Pozi #2 screwdriver - IU mounting in a 19" rack and the ground lug.
• 7mm Spanner – Attaching the earth cable to the IU.
• 2.5mm Allen key - To change the position of the IU mounting
brackets.
x. DC power supply cable: minimum 2.5 mm square conductor, rated for 10 A. For
connection between the power supply and the Indoor Unit DC connector on the
rear panel. (The DC connector is on the front panel of the Orion IU.)
• IU ground lug: 10-4 (10 square mm for wire and hole big enough for
M4 thread)
OU
• 13 mm wrench / spanner – used for attachment of OU to mounting
bracket and mounting bracket to pole. Also used to close OU with
hinge type connection box.
• 2.5 mm Allen key - used to tighten OU connection box cover
fasteners.
• OU ground lug: 10-8 (10 square mm for wire and hole big enough for M8 thread)
• Multimeter (recommended) to measure RSSI at OU during antenna panning. The RSSI level
may also be read from the NMS / GUI via laptop connection to the IU, indoors
Please refer to paragraphs 4.3.1 and 8.5.10 for details on the RF and data cables,
which are also customer furnished equipment.