User's Manual

Prepare the tool for deployment 267
charging stand. The red LED flashes while the handset is
charging.
3 Remove the handset from the charger after it is ready for use.
--End--
Assembling the deployment tool
The deployment tool is composed of the following parts (letters correspond
to labels on the following figure):
a--adjustable tripod
b--extender arm connector
c--extender arm swivel
d--detente stop
e--detente
f--extension thumb screw
g--telescopic extension
h--Allen key
i--basestation attaching thumb screw
j--basestation
Figure 41
Deployment tool extension details
Nortel Communication Server 1000
SIP DECT Fundamentals
NN43120-123 02.02 30 March 2010
Copyright © 2008-2010 Nortel Networks. All Rights Reserved.
.