User's Manual

Chapter 4: Hardware and software
installation
All hardware components should be turned off while they are installed and connected. Once the installation
is complete, the system is turned on. The control unit will then upgrade all of the connected components,
including phones, to the appropriate level of firmware. In addition, when the system is turned on, it should
not be connected to the customer's data network. This ensures that the control unit will default to known
default IP address settings (unless you have pre-loaded the System SD card with a configuration file with
different settings).
Installation checklist
Use this checklist to monitor your progress as you install a B5800 Branch Gateway system.
#
Description Section
1 Review the prerequisites. See Prerequisites on page 29.
2 Review the Installation
requirements.
See Installation requirements on page 35.
3 Review the required tools and
equipment.
See Tools and equipment required on
page 48.
4 Unpack the equipment. See Unpacking equipment on page 49.
5 If you want to pre-configure the
system, there are several tasks
you can perform to configure the
SD card before it is installed in the
control unit.
See SD card preparation on page 50.
6 Prepare the base and trunk cards
and install them in the control
unit.
See Base and trunk card installation on
page 53.
7 Do one of the following:
• Install the control unit on the
wall.
• Install the control unit in a rack.
See one of the following:
Wall mounting on page 59.
Rack mounting on page 61.
Implementing the Avaya B5800 Branch Gateway November 2011 47