User's Manual
These critical points must be:
• adjacent to a critical point and on the opposite side of the cell boundary area.
(critical point = P1
1 in
Figure 39: Identify new critical points (P11, P12, P13,
P14, P15, P16, P17) on page
71, where cell boundary area = IC2),
• just inside of where the cell boundary meets the outside wall (P12, P13, P14
and P15 in
Figure 39: Identify new critical points (P11, P12, P13, P14, P15,
P16, P17) on page 71), and
•
where cell boundaries meet (P16 and P17 in
Figure 39: Identify new critical
points (P11, P12, P13, P14, P15, P16, P17) on page 71).
12. Demarcate additional cell boundaries to cover all areas of the building.
Repeat step 1 on page 91 to step 8 on page 93 as necessary to demarcate new
cell boundaries in the middle of the building.
Refer to Figure 40: Contours formed by critical points P11, P13 and P16 on
page 71, Figure 41: Cell centre 1C5 formed by critical points P11, P13 and P16 on
page 72, and Figure 42: Cell boundary 1C5 formed by critical points P11, P13 and
P16 on page 72. Critical points P11, P13 and P16 form:
• contours in Figure 40: Contours formed by critical points P11, P13 and P16 on
page 71
• the cell centre 1C5 in Figure 41: Cell centre 1C5 formed by critical points P11,
P13 and P16 on page 72
• a new cell boundary in Figure 42: Cell boundary 1C5 formed by critical points
P11, P13 and P16 on page 72
Refer to Figure 43: Example of critical point cell boundaries on page 73
and
Figure
44: Example of cell centre boundary 1C6 on page
73. Critical points P11, P12 and
P17 form:
• contours in
Figure 43: Example of critical point cell boundaries on page
73
• a new boundary based on cell centre 1C6 in
Figure 44: Example of cell centre
boundary 1C6 on page
73
Figure 40: Contours formed by critical points P11, P13 and P16 on page 71
shows
a floor plan with complete radio coverage. The floor plan is made complete by cell
boundary 1C7.
Correcting problems with audio quality
If a user of
fice is near the critical point and the audio quality deteriorates within the user office,
then the deployment tool and the cell centre are not properly located.
Site planning
94 DMC DECT Fundamentals August 2012
Comments? infodev@avaya.com