User's Manual

Figure 99: DMC8/DMC8-E jumper details
See Installing DMC8 and DMC8-E in an IPE shelf on page 163 for card jumper settings.
Caution:
Service Interruption
Ensure that the DMC8/DMC8-E Relay card jumpers J6 to J9 are in the ETH position for
operation on a dedicated LAN.
Ensure that the DMC8/DMC8-E Relay card jumpers J6 to J9 are in the V
.24 position for
operation on a serial connection to the DMC DECT Manager server.
Installing DMC8 and DMC8-E in a Cabinet or Chassis
1. Avaya CS 1000E cabinet installation only - install MGC Breakout Adapter
2. CS 1000E only -- install clock sync cable if you use a two-shelf configuration. For
an example see
Figure 105: Example of two-shelf 15-card system in two MG1000E
Chassis and Expanders on page
175
3. Install J1 jumper straps on the DMC8 and the DMC8-Es for Card ID.
For pre Release 23 software strap A B. For post Release 23 software, and Multi-
Site Mobility Networking, strap B C.
4. Install J2 jumper straps on the DMC8 and the DMC8-Es for system type.
Strap A B for Cabinet, Chassis, MG 1000E, or MG 1000E Expander, or MG 1010E
Installing DMC8 and faceplate cables
DMC DECT Fundamentals August 2012 171