User's Manual
• A volt/ohm meter
• Hand tools and hardware, such as:
- screwdrivers and pliers
- spanners and socket wrenches
- drill and drill bits
- screws and screw anchors
- punch-down tools for MDF and RJ45 Connect Box
- cable continuity checking equipment
Unpacking the equipment
T
o unpack the equipment, complete the steps in the following table.
Unpacking and examining the equipment
1. Check the items shipped for discrepancies against the list of equipment required
for the installation.
If any items are missing, take the action that is appropriate for this situation.
2. Carefully unpack and examine the equipment for damage.
If any items are missing, take the action that is appropriate for this situation.
Note:
Store the equipment containers away from the installation area. Use the containers to return
damaged equipment.
Using the Provisioning Records, marked-up floor plans, and the site work order
, the installation
proceeds in this sequence:
1. Install basestation
2. Install additional IPE shelves or cabinets
3. Install DMC8 cards and faceplate cables
4. Install DMC DECT Manager application
5. Configure DECT on the DMC DECT Manager server
6. Configure handsets and retrieve subscription data
7. Handset subscription
8. Basestation Power and Muting
9. Add a V.24 serial connection
Installation and configuration
124 DMC DECT Fundamentals August 2012