User's Manual

Chapter 5: Installation and configuration
Contents
This chapter contains information on the following topics:
Before you begin on page 123
Unpacking the equipment on page 124
Provisioning records on page 125
Installing the basestation on page 128
Installing additional IPE shelves or CS 1000E cabinets on page 152
Installing DMC8 and faceplate cables on page 158
Installing the DMC DECT application on page
179
Configuring handsets and retrieve subscription data on page
195
Basestation Powering and Muting on page
198
Implementing and operating MSMN on page
224
Before you begin
The following three tasks must be completed before DECT
is installed.
1. The site survey
2. The deployment
3. The installation of the house wiring for basestations
After these tasks have been completed, the following information and materials are required
before continuing with DECT installation.
• Site work order
• List of equipment to be installed, showing quantities
• A marked-up floor plan
DMC DECT Fundamentals August 2012 123